|
REPLACEMENT CONSTRUCTION OF MUEHLENARM RATHENOW WEIR SYSTEM
The old weir system at the old "Konsummühle" (consumption mill) in Rathenow an der Havel was replaced by a new construction by the Brandenburg Water and Shipping Authority.
Technical data of the weir:
clear span 2 x 22.00 m, height of fall 1.06 m during mean tide level (MTL)
Bilaterally controlled LEA (linear electric actuator) regulates the fish-belly gates.
Techn. Data LEA F = 600kN Lift Height = 3500 mm
|